Description 

In a presentation at NCE’s Bridge Design and Maintenance conference, Nick Ianetta, the head of engineering at Mabey Bridge, discussed the advantages of modularity and off-site construction in creating sustainable, climate-resilient infrastructure.

Ianetta provided various case studies to highlight the environmental challenges in bridge specification and showed how accelerated bridge construction can be effectively implemented. He also emphasized the role of modular steel solutions in reducing project risks and boosting efficiency.

 

 

Share
Top