Water Engineering

Practical Experience of Installing Slurry Walls

Author(s) David Stephen Scopes, BEng, CEng, MICE, SupE   Abstract Although the Horncastle project was a new build embankment, the cut-off, in the form of a slurry wall, was installed once the embankment construction was complete. As such the installation process...

No AccessResearch on Risk Designation and Small Raised Reservoirs

Author(s) James G. Penman, BSc, MSc, DIC, CEng, FICE Simon R. Golds, MEng, CEng, MICE Omar H. Raja, BEng, MSc   Abstract The Department for Environment, Food and Rural Affairs (Defra) awarded a contract to Mott MacDonald in March 2017 for ‘Applying a risk-based...

Improved Drawdown Facilities at Three Flood Storage Reservoirs

Author(s) Andrew Pepper, BSc(Hons), CEng, MICE, FCIWEM, C.WEM   Abstract The Hertfordshire and North London Area of the Environment Agency has 18 flood storage reservoirs (FSRs) which come within the remit of the Reservoirs Act 1975. Many have fixed flow control...

Compression Waves in Semi-circular Channel

Authors Emelia Dara Soechiarto, BEng Davide Wűthrich, PhD Hubert Chanson, PhD, DEng   Abstract Partially filled pipe flows are commonly observed in urban hydraulics, sewers and road crossings.The occurrence of a compression wave in the confined space may result...

Top